Shanghai Jintai Engineering Machinery Co., Ltd.

Engineering Equipment, Hydraulic Diaphragm Wall Grab Manufacturer

HomepageEngineering MachinerySG series Hydraulic Diaphragm Wall Grab
Hydraulic Diaphragm Wall Grab

SG series Hydraulic Diaphragm Wall Grab

Working Principle of Hydraulic Diaphragm Wall Grab:
1. Making guide wall;
2. The machine digs along the guide wall; and at the same time, using inclinator to measure the verticality;
3. Adjust the grab verticality to keep the wall precision;
4. Slurry should be used to prevent wall collapse;
5. And finally clean the wall bottom, place the cage and then concrete the cement.
Features of Hydraulic Diaphragm Wall Grab:
1. Low vibration and noise, so it can also work during night;
2. Electron detector, inclinometer and hydraulic push-plate are equipped to control the depth and verticality;
3. High wall strength: thus the walls can bear huge side pressure and avoid groundsill sinking and landslip;
4. Good penetration resistance;
5. Cost Saving: functions like soil retaining, water stealing and weight bearing, etc are all integrated;
6. Can be used as the rigid foundation to replace shafts, and other foundation.
Applications of Hydraulic Diaphragm Wall Grab:
The Hydraulic Diaphragm Wall Grab can be used in the deep pit wall of subway, underground works, garage and street, as well as in underground transformer substation and high building’s basement.
It especially can be used in deep pit wall in dense buildings of cities.
Construction Procedure:

Guide Wall:

Parameters of Hydraulic Diaphragm Wall Grab:

 Model SG22 SG30 SG35 SG35A SG40 SG40A
Wall width (m) 0.22-0.6 0.35-1.0 0.3-1.2 0.3-1.2 0.35-1.2 0.35-1.5
Wall depth (m) 45 50 60 60 70 70
Max traction force(kn) 280 300 350 350 400 400
Main winch pulling force 140 160 200 200 220 2*200
Engine output (kw) 194 194 194 194 261 263
System pressure (Mpa) 30 30 30 30 30 30
Pump flow(L/min) 2×230 2×260 2×260 2×260 2×280 2×380
Diesel motor Cummins
6CAT5.9-C
Cummins
C8.3-C(6CTA)
Cummins
C8.3-C(6CTA)
Cummins
C8.3-C(6CTA)
Caterpilla
r C-9
QSM11-C
Max rotating speed of motor (rpm) 2100 2200 2200 2200 1900 1900
Chassis type R455LC-7 JT45 R305LC-7JT70 R455LC-7JT70 R455LC-7JT70 CAT330
DTC325VH
R455LC-7JT70
Distance of outside track (mm) 3200-4300 3200-4300 3200-4300 3200-4300 3000-4300 3200-4300
Track board width (mm) 800 800 800 800 800 800
Traction force (kn) 250 500 500 500 500 500
Moving speed (kn/h) 1.5 1.5 1.5 1.5 1.5 1.5
Weight (except for grab )(t) 42 49.5 53 60 57 63


Related Engineering Equipment
Hot products
    1. ZKD series Multi-pipe Drilling Rig Working Principle of Multi-pipe Drilling Rig:
      SMW method: mix and agitate soil and cement slurry in the original position to form underground diaphragm wall; The machine can be divided into three categories according to diameters: Ф650, Ф850 and Ф1000. Two Types of SMW method: ...
    1. GPS series Engineering Drilling Rig GPS series engineering drilling rigs are used to create shafts in the construction ground including high building, port, dam and other basic construction as well as drill water well. The max drilling diameter is 3m and max drilling depth of this engineering drilling rig ...
    1. SPJ(tc) series Water Well Drilling Rig Features:
      1.This engineering machinery has high working efficiency by use of multi- drill pipe. 2. This multi-pipe drilling rig works stably. The verticality can be controlled below 0.2:100